METHODOLOGY

B-Met

Our activity defines itself from the organizational support in the following planning phases:

               Preliminary investigation           

 

  • Local investigation of the topographic and environmental technical conditions for the definition of the Pstarting situation in power supply and building-technical regard as well as for the following evaluation from measures to the optimization
                    Measure planning                  

 

  • list of a measure planning for the optimization of the energy-saving potentials by means of application of passive, environmental careful systems (e.g. increased lagging, ventilations, orientation)
  • localization from supporting sources to the energy conservation and/or. the use of renewable energies view of economy of the defined measures for the evaluation of the use of alternative sources of energy
                 Project engineering                 

    

  • construction measures generally and in particular in lasting building method
  • solar ones and passive cool and heating systems
  • purposeful use of warm-damming and heat-storing building materials
  • ventilation systems
  • lasting one building-technical conception
                    Building support                   

  

  • presentation of the documentation for the demand for permit planning
  • execution planning
  • preparation and co-operation with the assignment
  • construction supervision